Roll out MES by process stage: wrong material and traceability first

Standard modules, three stages that can be implemented separately. Most plants start with SMT loading error-proofing and reel-level traceability, then extend to DIP, test and assembly. Each stage is accepted on its own; the whole plant does not have to be covered at once.

Deliverables

Standard module list

Scope is decided against the existing system boundary: where order and purchasing are already covered, add shop-floor execution; where the warehouse still runs on ledgers, add material and bin management.

01

Warehouse and material

Bins, lot numbers, FIFO, kitting, issuing and leftover counting.

02

Planning and work orders

Work-order breakdown, material availability checks, dispatch by line and progress tracking.

03

Production execution

Station pass-through checks, production reporting, piece-rate counting and WIP quantity.

04

Quality management

First-article inspection, patrol inspection, defect codes, rework and retest records.

05

Equipment and traceability

Equipment register, parameter capture, SN and carton traceability.

06

Reports and dashboards

Output, first-pass yield and downtime by line, work order and shift.

How it runs

Four steps

Every step ends in something that can be signed off, not a verbal understanding.

  1. 01

    Site study

    Follow the actual flow of work orders, material and production reporting to locate where the problems occur.

  2. 02

    Proposal and quotation

    A module list, implementation order and acceptance criteria, quoted module by module.

  3. 03

    Implementation and commissioning

    Master data, interfaces and hardware deployed together, validated on one line first.

  4. 04

    Trial run and acceptance

    Staged trial runs, accepted against wrong-material interception, traceability lookups and reporting definitions.

When it fits

Standard modules fit these situations better

Match two or more and a per-stage proposal makes sense.

  • High mix, low volume

    Frequent changeovers and many part numbers; kitting and material search take up most of the setup time.

  • Customer audits require traceability

    Reel-level or batch-level records are required, showing which reel went onto which board.

  • ERP in place, shop-floor execution missing

    Orders and purchasing live in ERP while the floor still runs on paper, Excel and chat groups.

  • New line or line retrofit

    The plant wants staged go-live and staged acceptance instead of stopping production for a single cutover.

Next step

Describe the line and get a first module list

Process stages, number of lines and the problem that hurts most are enough; no requirements document is needed first.

Address
Building 8, Room 303, Yilisheng Industrial Park, 602 Fengtang Avenue, Tangwei Community, Fuhai Street, Bao'an District, Shenzhen

Shenzhen Baichuan Zhike Technology Co., Ltd. · Since 2015 , serving electronics manufacturers across handsets, tablets, automotive electronics, FPC, WiFi modules, energy storage and more.

Used for this conversation only; never shared externally. By submitting you agree to be contacted about this request.

Questions?