Changeover: finding material takes longer than setting up
On-site
High-mix, low-volume: a line may change over a dozen work orders a day. Material is found from the BOM, then dug out of racks — several reels of the same part may be stacked, and which one to use and how much is left is down to feel. Once collected, feeders are checked reel by reel; one wrong check means starting over.
System
The feeder placement table is generated from the work order and model, and the kitting list goes straight to the rack. The rack lights in feeder order and guides by FIFO with partial reels first. After picking, each reel is scanned and checked against feeder and part number; a mismatch is reported on the spot instead of surfacing at placement.